色精品一区二区三区-色久阁-色久影院-色久综合大榴莲-国产成人精品亚洲一区-国产成人精品一区

ChineseEnglish Hotline:0571-86062609
Industry information current location:Home  > News > Industry information
Water jet loom Click rate: Release time:2024-02-18 Information sources:Hangzhou Qiyao New Material Co.,Ltd.

Water woven fabric production can be divided into two processes.

Before the process of twisting, winding, warping, threading warp.

Fixed twist: After twisting the yarn, especially after strong twisting, the fiber produces torsion stress, and the yarn will be untwisted and twisted when the yarn tension is small or free. In order to prevent this phenomenon and make the post-processing proceed smoothly, fixed twist processing is used to stabilize the twist of these yarns when necessary.

Winding simple: It is the first process of preparation before weaving, which is to process the yarn or Hank from the spinning department into a bobbin that meets certain requirements on the winding machine.

Warping: The process of winding a fixed number of warp threads parallel to a warp or knitting shaft in a specified length and width. The warped warp is used for sizing and threading. Warping requires that the tension of each warp is equal, the distribution on the warp shaft or the knitting shaft is uniform, and the color yarn arrangement conforms to the process regulations.

Threading warp: Threading warp is a general term for threading and knotting, and its task is to pass the warp on the weaving shaft through the warp stop, heald and reed at one time according to the provisions of the fabric drawing. Threading is the last step in preparing the warp before knitting.

After the process of opening, filling, filling, winding, letting off.

Opening: The opening mechanism is generally composed of a harness lifting device, a harness back device, and a control device for the lifting order of the harness frame. In the shed structure, the first half of the shed can not be changed, it is related to the weft insertion system, the new bow | weft requires the first half of the shed is small. The length of the back shed directly affects the warp tension. Because of the low strength of the yarn, the back shed is required to be long.

Weft insertion: On the loom, weft insertion is to introduce the weft into the shed formed by the opening of the warp, so that the warp and weft are interwoven to form the fabric. The | weft insertion method of the water-jet loom uses water as the weft insertion medium, and generates friction traction on the weft yarn through the jet stream, which leads the weft yarn on the fixed bobbin into the shed.

Weft beating: On the loom, relying on the reed of the weft beating mechanism to move back and forth, the weft yarn of a bow | into the shed is pushed to the knitting edge and interwoven with the warp yarn to form the fabric meeting the design requirements.

Pick up: After the weft is driven into the weave to form the fabric, the fabric must be continuously drawn away from the weave and wound onto the roll.

Let off: the warp of the corresponding length is released on the weaving shaft, so that the warp and weft yarn is continuously interwoven to ensure the continuous production process of weaving.

Copyright ? 2017 qiyaomaterial.com All Rights Reserved Copyright·Hangzhou Qiyao New Material Co.,Ltd. Zhejiang ICP No. 17034714-1
主站蜘蛛池模板: 欧美黄三级在线观看 | 色多多视频在线播放 | 色播图片| 老师下面好紧 | 久久精品94精品久久精品 | 欧美日韩不卡码一区二区三区 | 99久久99这里只有免费费精品 | 奇米一区二区三区四区久久 | 精品卡一卡二 卡四卡视频 精品噜噜噜噜久久久久久久久 | 美女扒开腿让男生桶爽网站 | 午夜看片网站 | 天天干天天碰 | 最新免费jlzzjlzz在线播放 | 美女无遮挡拍拍拍免费视频 | 中文字幕在线色 | 性欧美巨大 | 亚洲综合激情网 | 午夜欧美精品久久久久久久久 | 国产香蕉一区二区精品视频 | 韩国三级hd中文字幕 | 亚洲视频二 | 美女好紧好大好爽12p | 亚洲精品视频区 | 看片在线 | freesex欧美| 手机在线亚洲 | 午夜肉伦伦影院在线观看 | 4虎影院永久地址www | 中文字幕在线天堂 | 99视频精品全国免费 | 国产欧美日韩综合精品无毒 | 狠狠干狠狠爱 | 免费一级欧美在线观看视频片 | 天天黄色| 一级毛片一级毛片一级毛片aa | 道区二区三区四区 | 噜噜噜狠狠夜夜躁 | 激情四月婷婷 | 农村妇女色又黄一级毛片卡 | 亚洲精品456人成在线 | 人人揉揉香蕉大免费不卡 |