色精品一区二区三区-色久阁-色久影院-色久综合大榴莲-国产成人精品亚洲一区-国产成人精品一区

ChineseEnglish Hotline:0571-86062609
Industry information current location:Home  > News > Industry information
Water jet loom Click rate: Release time:2024-02-18 Information sources:Hangzhou Qiyao New Material Co.,Ltd.

Water woven fabric production can be divided into two processes.

Before the process of twisting, winding, warping, threading warp.

Fixed twist: After twisting the yarn, especially after strong twisting, the fiber produces torsion stress, and the yarn will be untwisted and twisted when the yarn tension is small or free. In order to prevent this phenomenon and make the post-processing proceed smoothly, fixed twist processing is used to stabilize the twist of these yarns when necessary.

Winding simple: It is the first process of preparation before weaving, which is to process the yarn or Hank from the spinning department into a bobbin that meets certain requirements on the winding machine.

Warping: The process of winding a fixed number of warp threads parallel to a warp or knitting shaft in a specified length and width. The warped warp is used for sizing and threading. Warping requires that the tension of each warp is equal, the distribution on the warp shaft or the knitting shaft is uniform, and the color yarn arrangement conforms to the process regulations.

Threading warp: Threading warp is a general term for threading and knotting, and its task is to pass the warp on the weaving shaft through the warp stop, heald and reed at one time according to the provisions of the fabric drawing. Threading is the last step in preparing the warp before knitting.

After the process of opening, filling, filling, winding, letting off.

Opening: The opening mechanism is generally composed of a harness lifting device, a harness back device, and a control device for the lifting order of the harness frame. In the shed structure, the first half of the shed can not be changed, it is related to the weft insertion system, the new bow | weft requires the first half of the shed is small. The length of the back shed directly affects the warp tension. Because of the low strength of the yarn, the back shed is required to be long.

Weft insertion: On the loom, weft insertion is to introduce the weft into the shed formed by the opening of the warp, so that the warp and weft are interwoven to form the fabric. The | weft insertion method of the water-jet loom uses water as the weft insertion medium, and generates friction traction on the weft yarn through the jet stream, which leads the weft yarn on the fixed bobbin into the shed.

Weft beating: On the loom, relying on the reed of the weft beating mechanism to move back and forth, the weft yarn of a bow | into the shed is pushed to the knitting edge and interwoven with the warp yarn to form the fabric meeting the design requirements.

Pick up: After the weft is driven into the weave to form the fabric, the fabric must be continuously drawn away from the weave and wound onto the roll.

Let off: the warp of the corresponding length is released on the weaving shaft, so that the warp and weft yarn is continuously interwoven to ensure the continuous production process of weaving.

Copyright ? 2017 qiyaomaterial.com All Rights Reserved Copyright·Hangzhou Qiyao New Material Co.,Ltd. Zhejiang ICP No. 17034714-1
主站蜘蛛池模板: www.激情五月 | 日本不卡在线一区二区三区视频 | 一级特黄视频 | 黄网站视频| 色综合社区| 国产20岁美女一级毛片 | 欧美成人 色 图 | 国内视频一区二区三区 | 国产拍拍视频 | 日韩免费一级片 | 欧美一区二区三区黄色 | 热re久久精品国产99热 | 久久精彩免费视频 | 久久久久久久综合色一本 | 69xxxx女人 | 国产美女精品一区二区三区 | 亚洲网在线 | 亚洲综合日韩欧美一区二区三 | 欧美freesex| 国产综合在线视频 | 亚洲 欧美 91 | 中文字幕88页 | 国产成人v爽在线免播放观看 | 国产人成精品免费视频 | 亚洲一区二区欧美 | 三级在线观看国产 | 欧美xxxxbbbb | 丁香花在线电影小说观看 | www射| 亚洲综合成人网在线观看 | 99午夜高清在线视频在观看 | 欧美日韩在线成人看片a | 一级毛片免费全部播放完整 | 1024国产欧美日韩精品 | 国模私拍大尺度视频在线播放 | 超薄肉色丝袜精品足j福利 超黄视频在线观看 | 日本特级黄录像片 | 国模绪 | 国产精品综合色区在线观看 | 色人人| 欧美黑人性色黄在线视频 |